    How to compare tiling quotes for a rental property

    Property managers can get like-for-like tiling quotes by fixing the scope, splitting each line and agreeing how hidden damage is priced.

    Yanan ChenManager, TilekindTuesday 24 November 2026 · 2 min read
    A rental laundry with tiled walls, a front-loading washing machine and cabinetry, the kind of job tiling quotes must cover

    Picture a rental laundry with worn floor tiles. One quote prices the removal of the old tiles and taking them away. The other starts with a floor ready to tile. Both can say "retile laundry" at the top. Before passing the totals to the owner, ask each contractor to price the same starting point and the same finish.

    Mark where the work stops. Send both contractors the same photo or sketch. Mark the doorway, the cabinet edge and the tiled skirting. In this example the job includes the trim at the doorway, and the wall tiles stay in place. If the washing machine needs to be moved, ask who will move and reinstate it. Give each contractor the same brief and ask them to check it on site.

    Put the work on separate lines. Ask for separate lines for lifting the old tiles, taking away the waste, supplying the new tiles and laying them. For the supply line, record the tile being priced or the amount allowed for tiles, plus who handles delivery. For laying, ask whether the price includes grout and the doorway trim. If the owner is supplying any items, record that on both quotes so the owner can see what they will have to arrange.

    Agree how to price concealed work. Some floor repairs can only be assessed after the old tiles come up. Ask each contractor to say which preparation is included and what would be priced separately. Before work starts, agree who will photograph any newly exposed damage, who will price the extra work and who will authorise it. Ask the contractor to include any change to the timetable with the revised price.

    Send the owner a side-by-side comparison. Use one line per item and mark it included, excluded or to be confirmed. Show how long each contractor expects the laundry to be out of use and when they can confirm it will be ready again. In the example, the next step is to ask the second contractor to add removal and disposal as separate lines. Once both quotes cover the same work, the owner can compare the totals and see which decisions might still change them.

    Add Real Estate Today as a preferred source on Google

    Real Estate Today in your inbox

    The RET Nightcap and The Weekly Wrap, free for everyone in the industry.

    Latest from The Chat podcast

    Inside H360: how Harcourts turns data into better businessesNick Jewitt, Head of Data and Analytics, Harcourts · 21 Oct 2026